Skip to main content
NOIDA · GREATER NOIDA · DELHI · GHAZIABAD · GURUGRAM · FARIDABAD
Dispatch:Delhi NCR Service Coverage
Direct Support+91 98100 87151
Vansh Pest Control — The Best Pest Protection
Professional Treatment Protocol

Termite Control

Pre-construction piping and post-construction chemical barrier treatments for subterranean termite defence.
ISO 9001:2015 AuditedGovt. Udyam MSME RegisteredLow-Odour Formulations
Termite Control service poster — Vansh Pest Control
Target Infestations & Vectors

What this treatment targets.

Our trained technicians isolate and eliminate species-specific infestations using scientifically calibrated delivery methods:
✓Subterranean termites (Coptotermes and Heterotermes species) feeding on wooden door frames, flooring, and structural timber.
✓Mud shelter tubes extending along foundation walls, plinths, skirting boards, and electrical conduits.
✓Hollow-sounding woodwork, blistering veneer, discarded swarmer wings, and frass deposits near structural joints.
Standard Operating Procedure

Step-by-step treatment methodology.

Every job follows a strict technical sequence to ensure thorough coverage and long-term pest control.
STEP 01

1. Diagnostic Structural Inspection

Acoustic sounding of door frames, skirting boards, false ceilings, and wall cavities to map termite colony activity and entry points.

Inspection & SetupStep 01 of 04
STEP 02

2. Plinth & Perimeter Drilling

Drilling precision injection points along inner wall perimeters at regular intervals to access the masonry and soil interface below floor level.

Core ApplicationStep 02 of 04
STEP 03

3. Pressurised Termiticide Injection

Injecting low-odour emulsion applied by trained technicians under calibrated pressure to form a continuous subterranean barrier against foraging termites.

Targeted TreatmentStep 03 of 04
STEP 04

4. Precision Sealing & Clean-Up

Sealing all injection holes with matched white cement/polymer filler and wiping down all treated surfaces.

5. Post-Treatment Audit

Scheduled follow-up inspection to verify complete colony termination and barrier integrity.

Final VerificationStep 04 of 04
Visual Methodology ArchiveComplete 4-Step Technical Protocol
Inspection ProtocolTreatment ProcessProtection MethodTechnical Procedure
Step-by-step termite treatment methodology showing inspection, treatment application and follow-up procedures.
Anti-Termite Engineering

Pre-construction piping and post-construction chemical barriers.

We do both pre-construction reticulation piping and post-construction drill-and-seal treatments — many providers offer only one.
Phase 1 · New Construction

Pre-Construction Anti-Termite Treatment

Built-in subterranean barrier established during construction stages

When to install:

Ideal for new architectural builds, foundations, and extensions before flooring and concrete slabs are poured.

How it works:

Perforated subterranean reticulation piping network installed along internal plinth perimeters and foundation trenches, followed by emulsion pressurisation prior to flooring.

Key Engineering Advantages:
  • •Creates an unbroken chemical barrier across the entire foundation footprint.
  • •Network enables future recharging without drilling tiles or damaging finished flooring.
  • •Protects concealed plumbing chases and electrical conduits from termite entry.
Phase 2 · Inhabited Buildings

Post-Construction Anti-Termite Treatment

Drill-fill-seal chemical barrier for existing residential and commercial properties

When to apply:

Designed for inhabited homes, apartments, and commercial facilities experiencing active infestation or needing preventative renewal.

How it works:

Precision drilling along skirting perimeters, pressurized injection of non-repellent termiticide into masonry joints, and flush tile-matching sealing.

Key Treatment Advantages:
  • •Halts active termite colony foraging through non-repellent transfer technology.
  • •Pinpoint injection creates continuous vertical barrier without structural disruption.
  • •Holes sealed with colour-matched polymer compound for seamless floor finish.
i

Chemical Safety & Re-entry Protocols

We use low-odour formulations applied by trained technicians designed for indoor residential safety. Rooms should remain ventilated during drilling; safe re-entry for family and pets once the chemical barrier has dried and sealed, with ventilation guidance provided on site.

Transparent Pricing Structure

How our service pricing is determined.

Pricing is calculated per square foot of built-up area or running foot of perimeter treatment, confirmed upon on-site diagnostic survey.

Frequently Asked Questions

Common questions about termite control.

Clear technical guidance on treatment duration, preparation, and safety.
What is the difference between pre-construction and post-construction termite treatment?+

Pre-construction treatment installs an anti-termite reticulation piping network and treats soil trenches before concrete flooring is poured. Post-construction treatment uses precision drilling along inner wall skirtings to inject termiticide into existing flooring and walls.

How long does a termite treatment session take in an apartment?+

Treatment duration depends on the linear perimeter footage, number of wooden fixtures, and layout complexity, determined during the initial technical assessment.

Will the perimeter drilling damage my floor tiles or marble?+

Our technicians use rotary hammer drills along skirting grout lines. All injection points are filled and color-matched with polymer sealants to preserve your floor aesthetic.

Are the chemicals safe for children and senior citizens?+

Yes. Formulations are low-odour water-based emulsions applied by trained technicians that bond directly to soil and masonry. We advise occupants and pets to step out during chemical injection and return once the sealant sets and the space is ventilated.

Complementary Treatments

Related pest management protocols.

Anti-Termite Piping System

Under-floor reticulation network laid before flooring for seamless chemical replenishment without drilling.

View Protocol →

Wood Borer Control

Syringe injection and oil-based preservative treatment for powder-post beetle control in solid wood furniture.

View Protocol →

Cockroach Control

Targeted gel baiting and residual micro-sprays for German and American cockroach control in kitchens and drains.

View Protocol →
Helpful Resources

Related guides & prevention insights.

Practical prevention checklists, identification guidance, and preparation protocols from our technical team:

How to Identify a Termite Infestation Before Major Structural Damage

Learn how to spot early warning signs of subterranean termite activity in Delhi NCR homes, from mud tubes and hollow wood to swarmer wings.

How to Tell Termite Damage from Wood Borer Damage

A practical guide to distinguishing subterranean termite damage from powder-post beetle damage in furniture and structural woodwork.

Termite Control across the National Capital Region

Our mobile technicians provide on-site termite control across all 6 NCR operational territories:

Need enterprise coverage or scheduled maintenance?

Regional Dispatch · Sector 70, Noida · Shiv Apartment · 201

Book professional termite control in Delhi NCR.

Speak with our trained technicians for rapid-response inspection and structured application scheduling.

✓ Verified Field Technicians✓ ISO 9001:2015 Audited Standards✓ Low-Odour Safe Formulations